Eurowind Energy Romania Begins Construction of the Frumușița, Vector, and Pecineaga Nord-East Wind Farms
Eurowind Energy Romania announces it has obtained the setting-up authorizations from the National Energy Regulatory Authority (ANRE) and begins construction work on the Frumușița, Vector, and Pecineaga Nord-Est wind farms.
Together, they will add 138 MW of clean energy to the grid and will be equipped with 23 state-of-the-art Vestas turbines.
Adrian Dobre, Country Manager of Eurowind Energy Romania, stated:
"We are pleased to announce the start of construction work at Frumușița, Vector, and Pecineaga Nord-East, a moment that confirms we are honoring our commitments and staying on the planned track. For over a decade, we have built a strong local team, a growing portfolio, and trusted partnerships, and the years of preparation behind these three parks are now becoming concrete construction sites. These projects matter not only for their size, but because they mark a new stage in wind energy development at the national level. This is a step that reflects the consistency of energy policy in recent years, and we hope this direction continues, in order to support long-term investment and Romania's energy transition."
About the new Wind Farms
The Frumușița Wind Farm (Frumușița, Galați County) will have an installed capacity of 66 MW, with 11 turbines.
The Vector Wind Farm (Frumușița, Galați County) will have an installed capacity of 24 MW and 4 turbines.
Last but not least, the Pecineaga Nord-East Wind Farm in Pecineaga, Constanța County will have an installed capacity of 48 MW and 8 turbines.
Delivery of the Vestas V162-6.2 MW turbines is scheduled for the second half of 2026, and commissioning of the parks is estimated for 2027. Long-term maintenance will be ensured through a 20-year service contract.
Strengthening presence in Romania
Active on the local market since 2011, Eurowind Energy Romania develops and operates renewable energy projects with a dedicated local team. The company's portfolio includes four operational solar parks – Hălchiu, Măgurele, Pufești, and Teiuș – one wind farm, Pecineaga, and a pipeline of approximately 7.5 GW in various stages of development. The company has 184 MW in operation in Romania, including 60 MW of battery storage in Teiuș.
About Eurowind Energy
Eurowind Energy A/S is a Danish company specializing in the development, construction, and operation of renewable energy parks. Its portfolio includes wind, solar, hydrogen, biogas, power-to-heat solutions, and battery storage projects. Founded in 2006, the company has become a key player in the green energy sector, with more than 700 employees and operations in 16 markets across Europe and the United States.